Question: 65. During 2009, a departments 3-variance overhead standard costing system reported unfavorable spending and volume variances. The activity level selected for allocating overhead to the

65. During 2009, a department’s 3-variance overhead standard costing system reported unfavorable spending and volume variances. The activity level selected for allocating overhead to the product was based on 80% of practical capacity.

If 100% of practical capacity had been selected instead, how would the reported unfavorable spending and volume variances be affected?

Spending variance Volume variance

a. Increased Unchanged

b. Increased Increased

c. Unchanged Increased

d. Unchanged Unchanged

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Model Based Testing For Embedded Systems Questions!