Question: Under Pick Co.s job order costing system manufacturing overhead is applied to work in process using a predetermined annual overhead rate. During January 2009, Picks

Under Pick Co.’s job order costing system manufacturing overhead is applied to work in process using a predetermined annual overhead rate. During January 2009, Pick’s transactions included the following:

Direct materials issued to production $ 90,000 Indirect materials issued to production 8,000 Manufacturing overhead incurred 125,000 Manufacturing overhead applied 113,000 Direct labor costs 107,000 Pick had neither beginning nor ending work in process inventory.

What was the cost of jobs completed in January 2009?

a. $302,000

b. $310,000

c. $322,000

d. $330,000

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Model Based Testing For Embedded Systems Questions!