Question: 4.33 A quality control engineer has taken 50 samples, each of size 13, from a production process. The numbers of defectives are recorded below. Number
4.33 A quality control engineer has taken 50 samples, each of size 13, from a production process. The numbers of defectives are recorded below.
Number of Defects Sample Frequency 0 9 1 26 2 9 3 4 4 1 5 1 6 or more 0
(a) Test the null hypothesis that the number of defectives follows a Poisson distribution.
(b) Test the null hypothesis that the number of defectives follows a binomial distribution.
(c) Comment on your answers in
(a) and (b).
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
