Question: A time analyst for the Super-Fast speedway pit crew observed the mechanic in charge of changing both front tires during a pit-stop practice session. The

A time analyst for the Super-Fast speedway pit crew observed the mechanic in charge of changing both front tires during a pit-stop practice session. The mechanic’s job is divided into six work elements and a preparation time between drills. The element times (in seconds) for the first six cycles are shown in Table H.5.
a. Calculate the normal time for changing tires.
b. What sample size is appropriate for estimating the average time for work element 3 within ±1 percent of the true mean with 99 percent confidence?
c. What is the standard time for changing tires if the allowance is 20 percent?TABLE H.5 PIT CREW TIME STUDY DATA OBSERVATION Work Element 4 RF 1. Wait for car lift 0.5 2.9 3.2 2.6 1.0 2. Remove lugs

TABLE H.5 PIT CREW TIME STUDY DATA OBSERVATION Work Element 4 RF 1. Wait for car lift 0.5 2.9 3.2 2.6 1.0 2. Remove lugs 3.3 3.8 3.6 3.8 4.0 4.3 1.0 0.9 3. Switch tires 6.4 6.2 6.4 7.1 6.8 7.3 1.0 1.2 4. Tighten lugs 3.5 4.1 3.8 3.5 4.9 4.2 1.0 0.8 5. Move to right side 3.2 3.8 4.3 0.5 1.2 6. Clear away for drop 0.5 2.7 2.1 2.0 0.9

Step by Step Solution

3.32 Rating (161 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

SuperFast Speedway The following table shows the elapsed times for each of the observations ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Operations Management Questions!