Refer to problem 3. If the cost of the components varies according to their reliability levels as

Question:

Refer to problem 3. If the cost of the components varies according to their reliability levels as shown in the following table, and the cost to replace a failed system is $15,000, which of the foursystems (A, B, C, or D) should be chosen?

Component Reliability 0.92 0.93 0.95 0.97 Cost (in U.S. dollars) 2.500 1,500 2.000 3.000