Question: Refer to Table 8.2 as a basis for this problem. This months master production schedule calls for the production of 180 sandals, 120 dress shoes,
1. What is the average cycle time for each model to achieve the production quota in 8 hours? Hint: Cycle Time = Operating time/ desired production.
2. If a mixed-model production schedule is used, how many of each model will be produced before the production cycle is repeated?
Table 8.2

FACTOR RATINGS SCORE FOR RATING FOR RATING FOR SCORE FOR (IMPORTANCE) (1-5) SHANGHAI SHANGHAI CHENNAI CHENNAI LOCATION LOCATION FACTORS (1-10) (1-10) 4 x 5= 20 4 x 7 = 28 Tax Incentives 4 5 5 x 3 = 15 Availability of Labor 5 3- 15 3 3 6. 36%3 18 Proximity to Customers 5 3 x 5 = 15 Per Capita Income 5 3 5 x 3 = 15 5 x 4 = 20 Transportation Network Availability 3 x 3 =9 4 3 x 4 = 12 Community Attitude 5 x 4= 20 5 x 5 = 25 Quality of Educational System 6. 4 x1 = 4 4 x 6 = 24 Provision for Site Expansion 2 x 10 = 20 2 x 6 = 12 10 6. 2 x 7 = 14 Proximity to Supporting 9. 2 x 9 = 18 Industries Utilities Availability 3 x 8 =24 3 8. 3 x 5= 15 TOTAL SCORE 161 182
Step by Step Solution
3.30 Rating (159 Votes )
There are 3 Steps involved in it
1 Using a 964 ratio of sandals to dress shoes to sneakers results i... View full answer