What is true about the output of the following code? A. It is negative because ints has
Question:
What is true about the output of the following code?
A. It is negative because ints has fewer elements.
B. It is 0 because the arrays can’t be compared.
C. It is positive because the first element is larger.
D. It is undefined.
E. The code does not compile.
Transcribed Image Text:
var ints = new int[] {3,1,4}; var others = new int[] {2,7,1,8}; System.out.println(Arrays.compare (ints, others));
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 0% (2 reviews)
Answered By
Ashington Waweru
I am a lecturer, research writer and also a qualified financial analyst and accountant. I am qualified and articulate in many disciplines including English, Accounting, Finance, Quantitative spreadsheet analysis, Economics, and Statistics. I am an expert with sixteen years of experience in online industry-related work. I have a master's in business administration and a bachelor’s degree in education, accounting, and economics options.
I am a writer and proofreading expert with sixteen years of experience in online writing, proofreading, and text editing. I have vast knowledge and experience in writing techniques and styles such as APA, ASA, MLA, Chicago, Turabian, IEEE, and many others.
I am also an online blogger and research writer with sixteen years of writing and proofreading articles and reports. I have written many scripts and articles for blogs, and I also specialize in search engine
I have sixteen years of experience in Excel data entry, Excel data analysis, R-studio quantitative analysis, SPSS quantitative analysis, research writing, and proofreading articles and reports. I will deliver the highest quality online and offline Excel, R, SPSS, and other spreadsheet solutions within your operational deadlines. I have also compiled many original Excel quantitative and text spreadsheets which solve client’s problems in my research writing career.
I have extensive enterprise resource planning accounting, financial modeling, financial reporting, and company analysis: customer relationship management, enterprise resource planning, financial accounting projects, and corporate finance.
I am articulate in psychology, engineering, nursing, counseling, project management, accounting, finance, quantitative spreadsheet analysis, statistical and economic analysis, among many other industry fields and academic disciplines. I work to solve problems and provide accurate and credible solutions and research reports in all industries in the global economy.
I have taught and conducted masters and Ph.D. thesis research for specialists in Quantitative finance, Financial Accounting, Actuarial science, Macroeconomics, Microeconomics, Risk Management, Managerial Economics, Engineering Economics, Financial economics, Taxation and many other disciplines including water engineering, psychology, e-commerce, mechanical engineering, leadership and many others.
I have developed many courses on online websites like Teachable and Thinkific. I also developed an accounting reporting automation software project for Utafiti sacco located at ILRI Uthiru Kenya when I was working there in year 2001.
I am a mature, self-motivated worker who delivers high-quality, on-time reports which solve client’s problems accurately.
I have written many academic and professional industry research papers and tutored many clients from college to university undergraduate, master's and Ph.D. students, and corporate professionals. I anticipate your hiring me.
I know I will deliver the highest quality work you will find anywhere to award me your project work. Please note that I am looking for a long-term work relationship with you. I look forward to you delivering the best service to you.
3.00+
2+ Reviews
10+ Question Solved
Related Book For
OCP Oracle Certified Professional Java SE 11 Developer Practice Tests Exam 1Z0 819 And Upgrade Exam 1Z0 817
ISBN: 9781119696131
1st Edition
Authors: Scott Selikoff, Jeanne Boyarsky
Question Posted:
Students also viewed these Computer science questions
-
QUIZ... Let D be a poset and let f : D D be a monotone function. (i) Give the definition of the least pre-fixed point, fix (f), of f. Show that fix (f) is a fixed point of f. [5 marks] (ii) Show that...
-
re Regular Languages and Finite Automata (a) Let L be the set of all strings over the alphabet {a, b} that end in a and do not contain the substring bb. Describe a deterministic finite automaton...
-
Let A, B be sets. Define: (a) the Cartesian product (A B) (b) the set of relations R between A and B (c) the identity relation A on the set A [3 marks] Suppose S, T are relations between A and B, and...
-
On January 1, Year 2, PAT Ltd. acquired 90% of SAT Inc. when SATs retained earnings were $900,000. There was no acquisition differential. PAT accounts for its investment under the cost method. SAT...
-
An e-mail message can travel through one of two server routes. The probability of transmission error in each of the servers and the proportion of messages that travel each route are shown in the...
-
The band director at a high school wants to estimate the percentage of parents who support a decrease in the budget for fine arts. Because many parents attend the schools annual musical, the director...
-
Describe and contrast selection bias and participation bias in sampling.
-
Presented below and on the next page is the balance sheet of Kishwaukee Corporation as of December 31, 2012. Note 1: Buildings are stated at cost, except for one building that was recorded at...
-
A claim is a contested change where the buyer and the seller cannot reach an agreement on compensation for the change or cannot agree that a change has occurred. Explain
-
Which of the following does not behave the same way as the others? A. var set = new HashSet (); B. var set = new HashSet (); C. HashSet set = new HashSet (); D. HashSet set = new HashSet (); E....
-
Which of these four pairs of declarations can point to an array that is different from the others? A. int[][][][] nums1a, nums1b; B. int[][][] nums2a[], nums2b; C. int[][] nums3a[][], nums3b[][]; D....
-
A uniform electric field of 10 kV/m points vertically upward. How far apart are the equipotential planes that differ by 100 V?
-
Circumstances prevent you from being able to observe the counting of inventory at Brentwood Industries. The inventory amount is material in relation to Brentwood? Industries' financial statements....
-
Given the following list of jobs. Job A B D F Burst Time 10 1 2 1 5 Priority 3 1 Calculate the average waiting time. 4 5 2 Draw a GANTT chart (plots of activity vs. time) for the given set of...
-
Jonah has been waiting for the new PlayStation gaming system to come out. When he learns of its release, he is turned off by the price and decides not to make the purchase after all. In this context,...
-
Using the graph, estimate the yeast population at T-4 hours. Then estimate the yeast population at T-8 hours. Calculate the the number of new yeast that appeared between hours 4 and 8. This value is...
-
2) A new latch is constructed using an OR gate, an AND gate, and inverter as shown in Figure 2 (16 Marks) below. Construct the state Table 2.0 for the latch. R H Table 2.0 R 0 0 0 0 1 1 1 IM 1 H 0 0...
-
Distribution of service department costs to production departments using the sequential distribution method similar to Self-Study Problem 1 Required: Using the information in P4-6 above, prepare a...
-
Wimot Trucking Corporation uses the units-of-production depreciation method because units-of-production best measures wear and tear on the trucks. Consider these facts about one Mack truck in the...
-
In PPP, we normally talk about user and system instead of sending and receiving nodes; explain the reason.
-
Compare and contrast HDLC with PPP.
-
Compare the flag byte and the escape byte in PPP. Are they are the same? Explain.
-
explain to me how these are both leasehold improvements with same original lease terms and renewals but have different percent's for cost of improvements. For example one has 15% and the other...
-
Consider the following combinational circuits: (i) F(x,y,z) =(1,2,5,6) F(x,y,z) = (1,3) F,(x,y,z) (0,4,7) (ii) F,(w,x,y,z) =(0,4,6,10,12,14) F(w,x,y,z) (2,3,4,8,11,15) F,(w,x,y,z) (0,2,9,13)...
-
List the interval(s) on which f is decreasing. The interval(s) on which f is decreasing is/are . (Type your answer in interval notation. Use a comma to separate answers as needed.) 14- 12- 10- 8- 16-...
Study smarter with the SolutionInn App