Question: A project involved development of a high speed hard disk drive. As part of its testing, the hard disk was subjected to continuous operation at


A project involved development of a high speed hard disk drive. As part of its testing, the hard disk was subjected to continuous operation at a high speed and an elevated temperature. At the end of the test, the hard disk was destroyed beyond use. The cost of such testing is usually classified as:

A. Appraisal costs B. Internal failure costs C. Cost of nonconformance D. Prevention costs