Sketch excess phase tree and phase trellis diagrams for each of the cases of Problem 10.7. Show

Question:

Sketch excess phase tree and phase trellis diagrams for each of the cases of Problem 10.7. Show as a heavy line the actual path through the tree and trellis diagrams represented by the data sequence given.


Data From Problem 7

Given the serial data sequence

101011 010010 100110 110011

associate every other bit with the upper and lower data streams of the block diagrams of Figures 10.2 and 10.4. Draw on the same time scale (one below the other) the quadrature wave forms for the following data modulation schemes: QPSK, OQPSK, MSK type I, and MSK type II.


Figure 10.2

Integrate and sample cos wf V; ==}AT, AT, + N1 }Ad (1) Parallel to Ad (t) y(t) = x.(t) + n(t) serial conversion 90° V;


Figure 10.4

d (t) = (1, –1, –1, 1, . . .); symbol duration = 27, s cos (t/2Tp) cos (2nf1) Σ sin (2æft) Serial/ d(t) = (1, 1, ?

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question
Question Posted: