Question: 1143 Consider the work breakdown structure shown in Figure 1118. Can the project be managed from this one sheet of paper assuming that, at the
11–43 Consider the work breakdown structure shown in Figure 11–18. Can the project be managed from this one sheet of paper assuming that, at the end of each month, the project manager also receives a cost and percent-complete summary?