Question: What was used first to develop the schedule: (a) a table such as Table 6.3, (b) a network diagram, or was (c) the Gantt chart
What was used first to develop the schedule:
(a) a table such as Table 6.3,
(b) a network diagram, or was
(c) the Gantt chart drawn first? Comment on the method used.