Which of the following generally cannot be validated using a work breakdown structure? A. Schedule control B.

Question:

Which of the following generally cannot be validated using a work breakdown structure?
A. Schedule control
B. Cost control
C. Quality control
D. Risk management


Using the work breakdown structure (WBS) shown below (numbers in parentheses show the dollar value for a particular element):

1.00.00 1.1.0 ($25K) 1.1.1 1.1.2 ($12K) 1.2.0 1.2.1 ($16K) 1.2.2.0

1.2.2.1 ($20K) 1.2.2.2 ($30K)