Question: For the relationships given in Table E12.1, draw the network diagram, calculate the EST, EFT, LST, LFT, and total float values of each activity, and

For the relationships given in Table E12.1, draw the network diagram, calculate the EST, EFT, LST, LFT, and total float values of each activity, and identify the critical path.