Question: The critical path is a. the shortest path in a network. b. the longest path in a network. c. the path with the smallest variance.
The critical path is
a. the shortest path in a network.
b. the longest path in a network.
c. the path with the smallest variance.
d. the path with the largest variance.
e. none of the above.