1. Complete the MRP schedule for the product below. Product A Lot Size = 200 Safety Stock...
Fantastic news! We've Found the answer you've been seeking!
Question:
1. Complete the MRP schedule for the product below.
Product A Lot Size = 200
Safety Stock = 50
Lead Time = 2 weeks Allocated = 100 In hand =500
2. Product X has the structure given below.
a) If 50 units of product X has to be produced, compute the bill of materials.
ITEM | QUANTITY |
P |
|
R |
|
S |
|
Q |
|
T |
|
V |
|
b) Given the following lead times draw the time phased product structure for X if delivery is desired in week 10 from now.