Question: 0-1 (25 Pts.): Draw a man and machine chart to show a man (i.e. the operator) who is operating two semiautomatic lathes ('A' and 'B').

0-1 (25 Pts.): Draw a man and machine chart to
0-1 (25 Pts.): Draw a man and machine chart to show a man (i.e. the operator) who is operating two semiautomatic lathes ('A' and 'B'). The task consists of the followings: 1. Loading a lathe machine by the operator (0,75 minute) 2. Turning the part which is Automatic (1.5 minutes) 3. Unloading a lathe machine by the oprator (0.5 minute) The two lath machines are alike, and each completes the turning operation and stops automatically. Note: The man and machine chart is to show the operator starting by loading machine 'A' first in the morning with both machines empty, and continues until both machines have completed the manufacturing of 6 pieces (i.e. 3 pieces by lathe 'A' and 3 pieces by Lathe "B). Q-1. Construct the man machine chart for turning 6 pieces (i.e. 3 pieces with Lathe 'A' and 3 pieces with Lathe 'B' and compute the percentage utilization figures for man and machines separately

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!