Question: . (0.375 points) Use the Wagner-Whitin algorithm to compute an optimal 6 month production schedule based on the following lot-sizing data. The ordering cost (A)
. (0.375 points) Use the Wagner-Whitin algorithm to compute an "optimal" 6 month production schedule based on the following lot-sizing data. The ordering cost (A) is S100 and the unit holding cost h is $1. t 2 3 4 5 6 D 20 60 10 80 45 2