Question: 1 0 . 1 0 The settling basins for a 5 0 - m g d wastewater treatment plant are operated in parallel with flow

10.10 The settling basins for a 50-mgd wastewater
treatment plant are operated in parallel with
flow split evenly to 10 settling tanks, each
of which is 3 m deep and 25 m wide, with a
length of 32 m .