Question: 1 0 . A job requires 2 0 0 , 0 0 0 cubic yards of compacted soil. The compacted dry density of the fill
A job requires cubic yards of compacted soil. The compacted dry density of the fill is determined to be pcf and must be placed at a moisture content of The material exists at the borrow pit at a dry density of pcf and moisture content of Calculate the amount of borrow that will be required and the amount of water that must be added per bank cubic yard to obtain desired moisture content.