Question: 1 0 . A job requires 2 0 0 , 0 0 0 cubic yards of compacted soil. The compacted dry density of the fill

10.A job requires 200,000 cubic yards of compacted soil. The compacted dry density of the fill is determined to be 120.0 pcf and must be placed at a moisture content of 15%. The material exists at the borrow pit at a dry density of 108 pcf and moisture content of 11.4%. Calculate the amount of borrow that will be required and the amount of water that must be added per bank cubic yard to obtain desired moisture content. (15)
1 0 . A job requires 2 0 0 , 0 0 0 cubic yards of

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!