Question: ( 1 0 Points ) Develop the activity sequence model and determine the normal time for the following work activity: A worker picks up a

(10 Points) Develop the activity sequence model and determine the normal time for the following work
activity: A worker picks up a screwdriver within reach from his worktable, positions it onto the head of a
screw, fastens the screw with six turns, and lays the screwdriver aside.