Question: 1 . 0 Problem 1 9 - 1 0 : ( Davis , 2 0 1 0 ) : Page 1 9 - 4 4

1.0
Problem 19-10: (Davis,2010): Page 19-44.
3
Problem 19-13: (Davis,2010): Page 19-45.
ALL THE BEST TO YOU ALL!!:
19-10. Using Figure P-19-9, lay out the sewer lines (placement, direction of flow, and manhole locations) for the residential area that includes the following streets: Ash, Sycamore, Forrest, Cedar, Birch, Elm, and Acorn. The mains may connect either to a trunk line that connects to an intercepting sewer along Main Street or directly to the intercepting. The trunk line discharges into the WWTP at the junction of Bull Run and Main Street.
Map for sewer layout. Elevations are in meters above mean sea level at points noted by dots. These are not manhole locations (Adapted from Metcalf & Eddy, 1981..)
19-13. Design a VCP gravity flow sewer main starting at the intersection of 4th and G Streets and ending at the intersection of 2nd and B Streets (Figure P-19-13). Prepare a sewer design table similar to that shown in Example 19-2 and a profile drawing similar to Figure 19-13b. Use the following assumptions: minimum invert depth i 3.0m, the invert of the sewer entering the main from G Street (east and west) is at an elevation of 102.13m. Contributing flows, including I??, from mains are given below, (Adapted from Metcalf & Eddy, 1981.)
Peak hour lateral flow rates including II
\table[[Street,Flow rate, m3s
1 . 0 Problem 1 9 - 1 0 : ( Davis , 2 0 1 0 ) :

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!