Using Figure P lay out the sewer lines placement direction of flow, and manhole locations for the residential area that includes the following streets: Ash, Sycamore, Forrest, Cedar, Birch, Elm, and Acorn. The mains may connect either to a trunk line that connects to an intercepting sewer along Main Street or directly to the intercepting. The trunk line discharges into the WWTP at the junction of Bull Run and Main Street.
Map for sewer layout. Elevations are in meters above mean sea level at points noted by dots. These are not manhole locations Adapted from Metcalf & Eddy,
Design a VCP gravity flow sewer main starting at the intersection of th and G Streets and ending at the intersection of nd and B Streets Figure P Prepare a sewer design table similar to that shown in Example and a profile drawing similar to Figure b Use the following assumptions: minimum invert depth i the invert of the sewer entering the main from G Street east and west is at an elevation of Contributing flows, including from mains are given below, Adapted from Metcalf & Eddy,
Peak hour lateral flow rates including
tableStreetFlow rate,
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock