Question: 1 0 pts ) A 6 lane freeway ( 3 per direction ) is under an operational review for concerns about current, short term and

10 pts) A 6 lane freeway (3 per direction) is under an operational review for
concerns about current, short term and longer-term traffic and roadway conditions.
Volume =5,000 vph in peak dir. (current) PHF =0.90
Volume =5,600 vph in peak dir. (in 3 yrs)10% Trucks & 0% RVs
Level terrain Mostly commuter traffic
FFS =70 mph (field measured) Growth rate =4% after 3 yrs
Using the HCM as guide find the estimate of speed, density, and LOS for this
freeway section now and in 3 yrs. Hint: Field measured FFS simplifies this, but be
sure to check of the flow exceed the breakpoint before estimating speed.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!