Question: ( 1 0 pts ) A coal - fired power plant is considering two options to remove fly ash from its stack gas. Using either
pts A coalfired power plant is considering two options to remove fly ash from its stack gas. Using either option,
an overall efficiency of must be achieved for a flow rate of million acfm. Assume a fan efficiency of
Option : Use an ESP. Pilot testing shows and of in
Option : Use two devices in series: a multiclone with efficiency for pretreatment followed by an ESP.
through the entire treatment train both devices is in Assume the same drift velocity for particles in the
Evaluate both options. For each, calculate:
a Total plate area of the ESP round up to the nearest
b Total power requirement fan power and corona power, rounding up to nearest kW
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
