Question: 1 . 1 2 A high - production operation was studied during an 8 0 - hr period. During that time, a total of seven

1.12 A high-production operation was studied during an 80-hr period. During that time, a
total of seven equipment breakdowns occurred for a total lost production time of 3.8 hr,
and the operation produced 38 defective products. No setups were performed during the
period. The operation cycle consists of a processing time of 2.14 min, a part handling time
of 0.65 min, and a tool change is required every 25 parts, which takes 1.50 min. Determine
(a) hourly production rate of acceptable parts and (b) scrap rate during the period.