Question: 1 1 - 6 ) Four trucks, 1 , 2 , 3 , and 4 , are waiting on a loading dock at XYZ Company
Four trucks, and are waiting on a loading dock at XYZ Company that has only a single service bay. The trucks are labeled in the order that they arrived at the dock. Assume the current time is : PM The times required to unload each truck Objectives in Job Shop Management: An Example An Introduction to Sequencing Theory for a Single Machine Chapter Eight Operations Scheduling and the times that the goods they contain are due in the plant are given in the following table.
Consider the information given in Problem Determine the sequence that the trucks should be unloaded in order to minimize a Mean flow time. b Maximum lateness. c Number of tardy jobs.