Question: 1 1 . 7 A sewer project entails the installation of 2 , 8 5 0 lf of 8 - in . sewer pipe. A

11.7A sewer project entails the installation of 2,850 lf of 8-in. sewer pipe. A backhoe equipped with a 1.2 cy capacity bucket will be used to excavate the trench 3 ft wide to an average depth of 8 ft through common earth that is expected to swell 25%. This size machine works at 17 sec per cycle and it is estimated that the trenching operation will operate at a 45 min per working hour efficiency. A 12-ft long trench shield will be used to shore the excavation so workers can enter the trench and it takes the crew an additional 2 min every 12 ft to move the trench shield along the trench as it's being excavated. Each section of pipe is 10 ft long and workers can assemble each joint of pipe in 1.8 min. The pipe will be laid on 4 in. of pipe bedding material and this same material will fill the trench to 1 ft above the top of the pipe. The rest of the trench can be backfilled using the same excavated material and any excess material can be disposed of on site at no additional cost. The crew can backfill and compact the trench with native material at a rate of 60 cy/hr. What is the estimated production rate of the pipe-laying operation in ft/hr?
11.8For a horizontal directional drill project, how much drilling fluid is required for a 12-in diameter, 900 ft long borehole installed through a high plasticity clay?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!