Question: 1 . 1 . Differentiate between the following support types used in mining excavations: Rock bolts and Shotcrete 1 . 2 . A zinc mine

1.1. Differentiate between the following support types used in mining excavations: Rock bolts and Shotcrete
1.2. A zinc mine is planning to extract ore at a depth of 600 meters. The rock density is 3050kgm3, and the UCS of the rock is 160 MPa . The cube factor of the rock is 65% of the UCS. The proposed dimensions include 9 m wide bords and 4.5 m wide pillars at a stoping height of 2.5 m . Use the factor of safety to assess the proposed pillar dimensions and recommend if they are sufficient to maintain stability.
1.3. You are the rock engineer for a platinum mine that is operating at a depth of 900 meters below the surface. Recently, the mine has experienced a series of rock falls, prompting a review of the current support systems. The rock mass has a density of 2800kgm3, and based on recent surveys, the 95% cumulative fallout height has been determined to be 1.4 meters. The mine uses elongates with a load capacity of 180 kN each. Your task is to design a new elongate support system to improve safety and reduce the risk of rock falls. Your design must also include support resistance, area supported by each elongate, and the support spacing on dip and strike.
1.4. Explain the role of backfill in underground mining support and list Five types of backfill systems used.
MIN3707
September 2024
Question 1: Support of mining excavations
1.1. Differentiate between the following support types used in mining excavations: Rock bolts and Shotcrete
MIN3707
September 2024
Question 1: Support of mining excavations
1.1. Differentiate between the following support types used in mining excavations: Rock bolts and Shotcrete
1 . 1 . Differentiate between the following

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!