Question: 1. (10 points) Solve the following precedence diagram network using the parallel method of resource allocation. The resource limits are as follows: 5 engineers (E)

1. (10 points) Solve the following precedence diagram network using the parallel method of resource allocation. The resource limits are as follows: 5 engineers (E) and 2 trucks (T). In addition, draw two graphs (one graph for each resource) showing the number of resources used (vertical axis) versus time (horizontal axis) for the network. On each
Step by Step Solution
There are 3 Steps involved in it