Question: 1 2 . 1 A highway cut is being constructed through high - mica schist. Drilling tests indicate that air - track drills with 3

12.1 A highway cut is being constructed through high-mica schist. Drilling tests indicate that air-track drills with
3.5in. STD bits can penetrate at 2ftmin. The drills use 12-ft steel. The blasting pattern will be 810 with 2ft
of subdrilling. The average depth to finish grade is 12ft. What is the drilling time (no fixed time) required to
penetrate to the required depth?12.1 A highway cut is being constructed through high-mica schist. Drilling tests indicate that air-track drills with 3.5 in. STD bits can penetrate at 2 ft/min. The drills use 12-ft steel. The blasting pattern will be 8 x 10 with 2 ft of subdrilling. The average depth to finish grade is 12 ft. What is the drilling time (no fixed time) required to penetrate to the required depth? ANS -7.0 min Please show work
1 2 . 1 A highway cut is being constructed

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock