Question: 1 2 . 5 On the next page, draw section A - A ( scale: r = 5 f t ) and then draw detalis

12.5
On the next page, draw section A-A(scale: r=5ft) and then draw detalis at the eave and the foundation (scale: 1-1/2=1). Assume 26 studs for exterior walls, OSB sheathing, fibercement eiding, tongue-and-groove OSB subfioor, and fiberglass Insulation as needed.
43
Name
(h) What is bridging of steel jolsts and how is it provided?
14.2
The adjacent sketch shows
the plan of a typical floor of a
6-story steel frame office. bullding. Using the plan as an underlay, draw the floor. framing plan, and provide the preliminary sizes of W-shape (primary and secondary) beame and columne.
Note: Refer to Chapter 16 and Appendbx B in the toxt.
1 2 . 5 On the next page, draw section A - A (

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!