Question: 1 . 2 Based on preliminary estimates and the architect's design, a team member has developed the anticipated crosplection for an office floor. The plan

1.2 Based on preliminary estimates and the architect's design, a team member has developed the anticipated crosplection for an office floor. The plan is to use cinder concrete, which is also called lightweight concrete.
What is the anfactored dead load pressure for the an-
75 mm Roinforent Cinde:
Metal Deck
200 mm Mechanical Duect
+25mma
i 50 mm Serpended Sieal Channel
and Acousical Fiber Beard