Question: 1 . 2 Exercise 2 There is a project for the construction of an embankment for a railway platform. The soil area is made up
Exercise
There is a project for the construction of an embankment for a railway platform. The soil area is
made up of an initial meters of gravel resting on meters of dense sands that are in turn sitting
on a solid rocky substrate of unknown thickness. meters below the gravel base, there are two
already built large diameter pipes meters with a meters distance between the centers of the
pipe sections, and made of highresistance steel, with a thickness of
The embankment's axis will meet the middle point between the pipes. The embankment itself will
be meters high, with meterhigh layers.
As a geotechnical engineer, you have been tasked with conducting a study on the possible impact
of the embankment construction on the existing underground pipes, so you will assess tis impact
by applying a Plaxis D numerical model. To carry out this process, you must consider the
following:
How would you model the existing underground largediameter pipes?
What construction phases should the numerical model have?
What results should be analyzed?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock