Question: 1 . 2 Exercise 2 There is a project for the construction of an embankment for a railway platform. The soil area is made up

1.2 Exercise 2
There is a project for the construction of an embankment for a railway platform. The soil area is
made up of an initial 5 meters of gravel resting on 10 meters of dense sands that are in turn sitting
on a solid rocky substrate of unknown thickness. 5 meters below the gravel base, there are two
already built large diameter pipes (3 meters), with a 7 meters distance between the centers of the
pipe sections, and made of high-resistance steel, with a thickness of 50mm.
The embankment's axis will meet the middle point between the pipes. The embankment itself will
be 8 meters high, with 2-meter-high layers.
As a geotechnical engineer, you have been tasked with conducting a study on the possible impact
of the embankment construction on the existing underground pipes, so you will assess tis impact
by applying a Plaxis 2D numerical model. To carry out this process, you must consider the
following:
How would you model the existing underground large-diameter pipes?
What construction phases should the numerical model have?
What results should be analyzed?
1 . 2 Exercise 2 There is a project for the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!