Question: 1 3 - Assume a system operate 4 0 his per week, 5 0 weeks per year, for 1 5 years in response to designated

13- Assume a system operate 40 his per week, 50 weeks per year, for 15 years in response to designated customer need. The system MTBF is 400 hes, the Met is 2 hrs, and two maintenance technicians are assigned for the duration of each maintenance action. Determine the maintenance labor hour per system operation hour (MLH/ OH).