Question: 1 . 3 . Consider a tunnel development end where a new support system is being tested. The development end is supported using Resin bolts

1.3. Consider a tunnel development end where a new support system is being tested. The development end is supported using Resin bolts (150kN peak load) and Steel arches (120 kN peak load). The rock density is 2900kgm3, and the thickness of the hanging wall to be supported is 3.5 meters.
1.3.1. Calculate the support demand for the hanging wall based on the provided rock density and thickness.
1.3.2. Calculate the support resistance provided by the support system in the development end, given that there are 5 resin bolts per meter length of the tunnel and 1 steel arch every 0.75 meters.
1.4. At 850 meters below the surface, in rock with a density of 3000kgm3, a system of square pillars is intended for mining. The stoping width will be 2.4 meters with 8 meters wide square pillars and 10 meters wide bords. The uniaxial compressive strength (UCS) of the rock was measured in the laboratory to be 140 MPa .
1.4.1. Use sketches to illustrate the pillar layout (i.e., plan view and section view).
1.4.2. Use the safety factor to evaluate and conclude on the stability of the planned pillar layout system. Write a short recommendation to the Mine Manager based on your judgement.
[30]
1 . 3 . Consider a tunnel development end where a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!