Question: ( 1 3 points ) Dry a wet material under constant drying condition. The drying rate curve in the fall - rate period is a

(13 points)Dry a wet material under constant drying condition. The drying
rate curve in the fall-rate period is a straight line. The drying rate Rc of the
constant-rate period is 1.5kg(m2*h), the critical water content x4 is 0.2, and
the equilibrium water content xt is 0.05. The dry area for the wet material
containing 40kg bone-dry content is 1m2. The weight of the wet material is
2000kg. Calculate the required drying time to reduce water content from
xi=0.35 to xg=0.1.