Question: ( 1 3 pts ) An order for 2 0 0 bolts is procesed on work centers 1 and 2 . The setup and run
pts An order for bolts is procesed on work centers and The setup and run times are as follows. It is decided to overlap the lot on the two work centers and to split the lot into two lots. mlease assume that the transfer lots are found using lot formulation. Move time between operations is minutes, Work center cannot be set up until the first lot arrives.
Setup on minutes
Run time on minutes per piece
Setup minutes Run time minutes per piece
Run time minutes per piece
units
Tra
fer Machine
a Calculate the manufacturing lead time before dverlapping.
b Calculate the manufacturing lead time after overlapping and saving in manufacturing lead time.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock