Question: 1 4 - 3 0 . Determine the theoretical minimum work required to dig a trench 1 0 0 m long with a crosssectional profile

14-30. Determine the theoretical minimum work required to dig a trench 100 m long with a crosssectional profile as shown in Figure P14-30. Assume that the soil weighs 4kNm3.
FIGURE P14-3
1 4 - 3 0 . Determine the theoretical minimum

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!