Question: 1 4 . 3 ) As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket

14.3) As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, two springs, and four clamps. The base is assembled from one clamp and two housings. Each clamp has one handle and one casting. Each housing has two bearings and one shaft. There is no inventory on hand. 1. Design a product structure noting the quantities for each item and show the low-level coding. 2. Determine the gross quantities needed of each item if you are to assemble 50 brackets. 3. Compute the net quantities needed if there are 25 of the base and 100 of the clamp in stock.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!