Question: 1 - 6 1 A city needs additional solid waste landfill capacity. It has identified two potential sites: Area A: Capacity is 1 6 million
A city needs additional solid waste landfill capacity. It has identified two potential sites:
Area A: Capacity is million cubic meters. Owing to the possibility of high groundwater the Regional Water Pollution Control Board has restricted the lower million cubic meters of fill to inert material only earth concrete, asphalt, paving, brick, etc. This must be purchased and hauled to this area for the bottom fill.
Area B: Capacity is million cubic meters. For of the city, the haul is the same distance as for Area A The round trip haul is miles longer for of the city, and miles shorter for of the city.
Assume the following conditions:
Cost of inert material for area A is $ cu m
Average speed of trucks from last pickup to disposal site is mph
The truck and a twoperson crew will cost $ per hour
Truck capacity is cubic meters per load
Sufficient cover material is available at both sites
Which site should be recommended?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock