Question: 1 6 ) A quality control program is being developed for batteries. The percent defective for these in the past has been 3 % .

16) A quality control program is being developed for batteries. The percent defective for these in the past has been 3%. If a sample size of 120 is taken, what would the 95.45%(2 sigma) upper control chart limit be?
A)0.0812
B)0.0767
C)0.0611
D)0.0307
E)0.0471