Question: 1 6 ) In which type of processing system would sugar refining be done? A ) Job Shop B ) Batch C ) Assembly D
In which type of processing system would sugar refining be done?
A Job Shop
B Batch
C Assembly
D Continuous
E Repetitive
The type of processing system which is used for high volume, highly standardized products is:
A Continuous.
B Intermittent.
C Jobshop.
D Batch.
E Unit.
In which type of processing system would gasoline be produced from crude oil?
A job shop
B batch
C assembly
D continuous
E project
What is the process flow diagram for services called?
A Process diagram
B Flow chart
C Service interaction diagram
D Service blueprint
E Productprocess layout
Which of the following is not true about process layouts when they are compared to product layouts?
A Lower maintenance costs
B Easier routing and scheduling
C Less investment in spare parts
D Less specialized equipment
E Common in services.
Chapter
Which of the following is an accurate match of quality gurus and their contribution?
A Ohno and ShingoCauseandeffect diagrams; quality control circles
B Crosby Control charts; variance reduction
C Ishikawa PlanDoStudyAct PDSA
D Shewhart Quality is free; zero defects
E Demingstatistical process control SPC
Which of the following is not an accurate match of quality gurus and their contribution?
A Deming distinguishing between special and common causes of variation
B Crosby zero defects
C Feigenbaum statistical process control SPC
D Juran fitnessforuse and measuring the cost of quality
Which of the following is not one of Deming's points?
A Eliminate suppliers that cannot qualify with statistical evidence of quality.
B Detect defects rather than prevent defects.
C Institute modern methods of training on the job.
D Drive out fear, so that everyone may work effectively for the company.
E Eliminate work standards that prescribe numerical quotas.
Which of the following is not an example of an external failure cost?
A Warranty claims
B Handling complaints
C Loss of customer goodwill
D Scrap and rework during production
E Price discounts to offset inferior quality
Defective material from suppliers and lost production time are examples of:
A internal failure costs.
B external failure costs.
C appraisal costs.
D prevention costs.
E replacement costs.
Quality planning and administration, quality training, and quality control procedures are examples of:
A internal failure costs.
B external failure costs.
C appraisal costs.
D prevention costs.
E replacement costs.
Which one is not the key feature of TQM
A A neverending push to improve quality, which is referred to as continuous improvement
B Detect defects rather than prevent defects.
C Everyone is involved in quality management in the organization
D The goal of everincreasing customer satisfaction.
Which of the following is a graphical representation of how an increase in deviation from the target value leads to a faster rate of increase in customer dissatisfaction?
A Control chart
B Scatter Diagram
C Run chart
D Process map
E Taguchi quality loss function
A small and volunteer group of workers of workers who meet informally to discuss ways to improve products or processes is called:
A brainstorming team.
B quality control circle.
C benchmarking team.
D continuous improvement team.
E quality team.
The basic steps in the PDSA cycle do not include:
A plan
B delegate
C study
D act
E do
Chapter
The purpose of control charts is to:
A estimate the proportion of output that is acceptable.
B inspect the quality of all outputs from a process.
C determine if the output of a process is within specifications.
D distinguish between random variation and assignable variation in a process.
E determine the amount of inspection required.
The term sigma limits in the context of a control chart refers to the variability of the:
A process.
B population.
C sample.
D sampling distribution.
E risk factor.
The probability of concluding that an assignable variation exists when only random variation is present is:
A Statistical shift
B Specification variation
C Control limit error
D Type I error
E Type II error
A control chart used to monitor the process mean is the:
A pchart
B Rchart
C xbar chart
D cchart
E Gantt chart
Which of the following is NOT needed to calculate sample mean control charts?
A A choice for z the standard normal deviate usually or
B The standard deviation of the sampling distribution.
C The sample range.
D The average of sample means grand mean
A shift in the process mean for a measured quality characteristic would most likely be detected by an:
A pchart
B xbar chart
C cchart
D Rchart
E schart
A point that plots below the lower control limit on the range c
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock