Apply drywall to the walls and celling of the garage.
Furnish and install the drywall hang and tape Use the following assumptions to answer the questions below:
$sf material costs includes gypsum wall board, tape and compound
Assume productivity rate of sf labor to hang drywall on the walls
Assume productivity rate of labor to hang drywall on the ceiling
Assume productivity rate of finishing at all surfaces taping
Assume labor rate of $ hour
Do not deduct for window or man door openings, assume this accounts for waste. However, deduct for the garage door.
Do not add a waste factor
a Round to the nearest piece of drywall. How many sheets are required? From the assumptions above, how much material cost should be included:
BEHM DESIGN PLAN #
WORDIR PANSCUL. IST
b How long will it take to hang and finish the drywall for both the walls and ceiling? At $ how much will it cost to hang the drywall?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock