Question: 1 8 ? 1 5 AC 1 2 0 - 9 2 B Appendix 2 APPENDIX 2 . SAFETY RISK MANAGEMENT ( SRM ) WORKSHEETS

18?15
AC 120-92 B
Appendix 2
APPENDIX 2. SAFETY RISK MANAGEMENT (SRM) WORKSHEETS
The worksheets in this appendix are provided to illustrate the SRM process and a possible way to develop and document the SRM processes required under Title 14 of the Code of Federal Regulations (14 CFR) part 5, subpart C. These worksheets are provided for illustrative purposes only. Carriers may develop their own record keeping systems and should determine the amount and depth of documentation and recordkeeping that are needed to show compliance. Not all situations will require the same degree of detail.
FIGURE A2-1. SAFETY RISK MANAGEMENT TRIGGERING CONDITIONS AND SUMMARY
NOTE: Refer to part 5,5.51
\table[[Title:,],[Reason for Risk Assessment,],[New System Design,],[Change to Existing System Design,],[New Operational Procedure,],[Modification to an Existing Operation or Procedure,],[Operational Environment Change,],[Ineffective Risk Control,],[,],[Brief Summary,]]
Where signed below, the authorized manager has determined that no new hazards have been introduced by this change:
Name:
Signature:
Page 1
 18?15 AC 120-92 B Appendix 2 APPENDIX 2. SAFETY RISK MANAGEMENT

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!