Question: 1 8 A 2 - cy dragline with a standard short boom is operated at 6 0 % optimum depth of cut and a 7
A cy dragline with a standard short boom is operated at optimum
depth of cut and a degree angle of swing. It is used to excavate moist
am The average bucket load, expressed in bcy can be taken to be
of the struck capacity, cubic feet listed, as listed in Table On the
assumption that the data from Tables and are applicable,
calculate the peak rate cycle time for the dragline in minutes.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock