Question: 1 9 - 1 3 . Design a VCP gravity flow sewer main starting at the intersection of 4 th and G Streets and ending
Design a VCP gravity flow sewer main starting at the intersection of th and Streets and ending at the intersection of nd and B Streets Figure P Prepare a sewer design table similar to that shown in Example and a profile drawing similar to Figure b Use the following assumptions: minimum invert depth is the invert of the sewer entering the main from G Street east and west is at an elevation of Contributing flows, including from mains are given below. Adapted from Metcalf & Eddy.
Peak hour lateral ow rates including
tableStreetFlow rate,