Question: (1) A B(2) C (3) D (1) IC (1) D (1) D(1) E (2) F (1) G (2) a. If the demand for product A
(1) A B(2) C (3) D (1) IC (1) D (1) D(1) E (2) F (1) G (2) a. If the demand for product A is 50 units, please answer the following: - how many units of part B will be needed? (1 Point ) - how many units of part D will be needed? (1 Point) b. If the demand for product A is 50 units, and there are 20 units of A on hand ( Inventoried ), please answer the following: how many units of part E will be needed? (1 Point) - how many units of part C will be needed? (1 Point) (2) Consider the assembly line below. Fabrication 24 min./batch Assembly 1 7 min./batch Fabrication 24 min./batch Packaging 3 min./batch Assembly 2 6 min./batch Fabrication 24 min./batch a) What is the bottleneck time of the system? (1 Point) b) What is the bottleneck station of this work cell? (1 Point) c) What is the throughput time? (1 Point) d) If the firm operates 10 hours per day, 5 days per week, 4 weeks per month, what is the capacity of this work cell for 3 months? (1 Points ) Page 4 of 11
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
