Question: 1 . A batch in a semiautomated machine from a sequential batch production operation consists of 5 0 0 parts. The setup takes 1 .

1. A batch in a semiautomated machine from a sequential batch production operation consists of 500 parts. The setup takes 1.5 hours. Every cycle, an operator loads the machine in 10 minutes and unloads the machine in 5 minutes. The processing time per piece is 4.5 minutes per part. Tool and handling time is done in 30 seconds using an automated robot. Ten parts are produced each cycle. a=500
T_(su )=1.5hrs
Load time ()/(c_(cyce ))=10min
Unload time ()/() cycle =5min
T_(0)=4.5mi(n)/(p)c
T_(t)=30mi(n)/(p)c
Parts ()/() Cycle =10
Find mi(n)/(b)utch
T_(p)=T_(su )+T_(c)Qb
T_(c)=10(4.5+30)0.5
Not stated in prompt: Tool handling time unit mi(n)/(p)C or mi(n)/(c)ycle
Assume tool and handling unit =mi(n)/(P)C
aT_(p)=3340mi(n)/(b)atch
R_(p)=(1)/(3340)=0.0002994butc(h)/(m)in
b(3340)/(60)=55.67hrs
DID I DO IT RIGHT? CAN YOU SOLVE IT AND SEE IF YOU GET THE SAME SOLUTION? THANKS
1 . A batch in a semiautomated machine from a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!