Question: 1 . A contractor has just been awarded a contract to construct a parking lot for a small shoppingcenter. The soil conditions are very poor,

1. A contractor has just been awarded a contract to construct a parking lot for a small shoppingcenter. The soil conditions are very poor, and the designer has decided to bridge over the poormaterial with a structural fill, 3 feet deep. The total estimated volume of material required is14,000 compacted cubic yards. The fill material is a sandy clay weighing 2,600 pounds per bankcubic yard. The percent swell for the fill material is estimated to be 25%, and the percent shrink-age at the design density is estimated to be 15%. The contractor has selected a borrow sourcethat is 0.5 mile from the construction site. The contractor plans to maintain the haul road with agrader, and the resulting rolling resistance is estimated to be 55 pounds per ton. The coefficient oftraction is estimated to be 0.6. The haul road has an uphill grade of 2% when traveling from theconstruction site to the dump area. Job conditions are considered to be favorable. The contractorplans to use elevating scrapers to construct the fill. Information about the scraper and performancecharacteristics are provided in Example 9.2 and Figure 9.9. How many scrapers should the contrac-tor use to complete the fill in five days, if he works 50 minutes per hour and nine hours per day?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!