Question: 1. A contractor will bid for two jobs in sequence. He has a 0.8 chance of winning the first job. If he wins the
1. A contractor will bid for two jobs in sequence. He has a 0.8 chance of winning the first job. If he wins the first job, he has a 0.2 chance of winning the second job; if he loses the first job, he has a 0.3 chance of winning the second job. Let X denote the number of jobs that he wins. Find the probability distribution function of X. 2 6