Question: 1 . A contractor will use a packaged emulsion having a specific gravity of 1 . 2 and relative bulk strength of 1 5 5

1. A contractor will use a packaged emulsion having a specific gravity of 1.2 and relative bulk strength of 155, to open an excavation in granite rock, sp. Gr.3.5. The drilling equipment available will drill a 4-in. blasthole. The explosive come packaged in 3(1)/(2)-in. diameter sticks. What is the recommended burden distance for the first trial shot? Round the calculated burden distance to the nearest foot.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!